House extensions in Victoria

Victoria sits in Westminster, where the streets are dominated by Edwardian bay-fronted semis with generous roof voids and easy scaffold access. The build that pays back most reliably here is a rooflight conversion that keeps the roofline untouched but floods the loft with light.

Typical all-in (inc VAT)
£146k–£216k
Build rate per m²
£3250–£4950
On-site programme
12–20 weeks

What we build in Victoria

Most Victoria projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Grade-II stucco terraces, mansion blocks and mews houses — many in conservation areas.

Mansard loft conversionsRear dormer loftsHip-to-gable conversions

Extension costs in Victoria

A mid-spec 25 m² extension in Victoria typically lands between £146,000 and £216,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £3250–£4950 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeVictoria all-in
Rooflight conversion15–20 m²£80k – £119k
Rear dormer kit20–28 m²£146k – £216k
L-shaped dormer kit28–36 m²£197k – £292k
Hip-to-gable + dormer30–40 m²£219k – £324k

Planning permission in Victoria

Westminster City Council is one of the strictest in London. Article 4 removes many permitted development rights; expect a full householder application and heritage-officer consultation for anything visible from the street.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Westminster and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Terraced and mansion-block context means a Party Wall Award is effectively guaranteed, often with two adjoining owners.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Tight on-street parking means bay suspensions and timed deliveries — your builder should price this, not absorb it.

Every quote we issue for Victoria prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Victoria

Light and layout move value here more than raw square metres — spend on glazing and ceiling height.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Victoria use us

  • KYB-verified builders only
  • Live Westminster project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp